Scooter, F-25A PROJECT

by Mike Wright and Pat Pilages

This is the construction of a Farrier,  F-25A.  In mid-November 2000 Mike sent the following comments about the project:

"We started the project over 7 years ago, as I have a small child there is a limited about of time I can work on it a week. Someday we will finish. The project started at my house in north Seattle, we have since moved to Mercer Island. The move cost us about months of building. This last summer it was at Wayne's while I fixed the old garage (removed the temporary extension) and sold the house. Towards the end of the summer I spent 14 weeks fairing the main hull below the gunwale. This took about 20 hours a week. A lot more work than I had envisioned though I am happy with the results. The boat will be moved into my new garage this weekend. We hope to launch next summer. The main hull is about complete as you can tell. The floats are done. The beams are done as well as the rig. It is mainly about finishing and then fit out. The interior probably will not be done till the following summer. At this point I just want to sail the boat. I can't believe it has been over 7 years. I think we will have spent 3000 hrs building the boat when finished. It is the third F-25A built by a club member. Jack Kinney and David Lund have finished theirs."

Click on the photo for a larger view.  Use your browser "back" button to return here.

Ann Erickson writes: 

"With the main hull ready to move back to Mikes house after painting it, they loaded it on the trailer.  Somehow it happened to be the night of our September club meeting and it was show and tell, so they stopped by and showed it off.  Here are club members milling around inspecting their work and generally enjoying the late summer evening. That's Randy "torture testing" the stern section."

Launch Report

Pat and Mike beside the main hull
Pat and Mike beside the main hull at the NWMA club meeting in September.

club members milling around inspecting their work

Hull sanding and fairing complete.  Ready for paint.
Hull sanding and fairing complete.
Aft Starboard of Main Hull
Aft Starboard of main hull
Bow shoot
Bow shot
Tight fit in the garage
Tight fit in the garage
Interior section
Interior section
Bow of an F-27 on left with Scooter's bow sticking out of garage.
Bow of an F-27 on left with Scooter's bow sticking out of garage.
Low angle stern shot of main hull
Low angle stern shot of main hull
Port bow shot of main hull
Port bow shot of main hull
       
Bow shot
Bow shot
Fwd beam section
Fwd beam section
Pictures in this row submitted Dec. 2001 just after the hull was painted scooter_05.jpg (25075 bytes) scooter_06.jpg (11222 bytes) scooter_07.jpg (20236 bytes)
Pictures in these rows submitted Sep. 2002